How a Modular Home Build Works
Thinking about a modular home in Southwest Florida? Here are the questions we hear most, answered in plain words. Red Viking Construction is an authorized Affinity Modular builder and the licensed general contractor on every job, from your lot to your keys.
What is a modular home?
A modular home is built in sections inside a factory, trucked to your lot, and set on your foundation by crane. Our crew then joins the sections and finishes the home on site. In Florida, modular homes are built to the same Florida Building Code as homes built on site.
Is a modular home the same as a mobile home?
No. A mobile home, also called a manufactured home, is built to a federal code on a steel frame with wheels. A modular home is built to the Florida Building Code and sits on a permanent foundation, like any other house.
What are the steps?
1. Lot check. We pull the survey, flood zone, setbacks and town rules so we know what fits.
2. Plan and finishes. You pick an Affinity layout, then colors, floors, cabinets and hardware.
3. Sealed plans. Engineers stamp the plans for your lot and wind zone.
4. Permits. We file with the county or town, plus the state when the lot is on the Gulf.
5. Foundation. Site work, utilities and, on the islands, pilings.
6. Factory build. Affinity builds the sections while the foundation goes in.
7. Crane day. The sections arrive by truck and a crane sets them on the foundation.
8. Button up and finish. We join the sections, close the roof and siding seams, build the stairs and decks, and finish the inside.
9. Final inspection and keys. The building department signs off and you get your certificate of occupancy.
How long does it take?
Permits set the pace. Affinity sealed plans take about 8 to 12 weeks and the factory build takes about 4 weeks. Site work runs at the same time as the factory build. We give you a schedule for your lot after the lot check.
What permits do I need?
Every home needs a building permit from the county or town, such as Lee County, Fort Myers Beach or Sanibel. Lots on the Gulf side of the state Coastal Construction Control Line also need a coastal permit from the Florida Department of Environmental Protection. We handle the filings.
What is a flood zone and why does it matter?
FEMA flood maps set how high your home must sit. On the beach many lots are in a VE zone, which means storm waves can reach them. In those zones the lowest beam of the home must sit above the flood level, and the area under the home can only be used for parking, storage and entry. Your flood zone also affects your flood insurance.
What are pilings?
Pilings are tall posts driven deep into the ground. On Fort Myers Beach and the other islands, many homes sit on top of them, high above flood level. The open space below is often used for parking and storage.
What happens on crane day?
Trucks bring the sections to your lot and a crane lifts each one onto the foundation. Most sets take one day. We plan the truck route, the crane spot and any road permits ahead of time.
What can I choose?
You pick from Affinity plans and selections. Claudia walks you through colors, floors, cabinets and hardware so the home fits how you live.
What changes the price?
The lot is the biggest factor. Beach lots need pilings, engineering and coastal permits. Size, layout, decks, stairs, an elevator, utility hookups, and room for trucks and a crane all matter too. We give you a full estimate after the lot check.
Who do I work with?
One team. Red Viking runs the whole job and is your single point of contact, from permits and pilings to crane day and final finish.
Ready to start? Send us your lot address and what you want to build. We will tell you what fits.